infrastructure
MERGE (Lynnmour Sound Wall) Update: Installation in Progress
On 09, Sep 2021 | In infrastructure, Make, News, Project | By Admin
We are very pleased to let you know that the installation of MERGE has commenced and is anticipated to be completed by the end of September.
MERGE (Lynnmour Sound Wall – 2021), will feature twenty naturalistic colours which represent a selection of local flora, fauna and landmarks specific to the Lynnmour community and area. Merge stands at 4m tall and spans 356m along the newly reconfigured section of the Trans-Canada Highway (Hwy 1) between Ironworkers Memorial Second Narrows Crossing and Lynn Creek. The acoustic dampening sound wall sits between the highway and the residential neighbourhood along Keith Road and is clad in colourful powder-coated aluminum panels. The panels have been carefully configured to produce a giant site-specific spectrum designed to be viewed by both passing traffic and residents in nearby communities.