2017 December
Calder Community Mosaic: Installation – part 5. Finishing Touches
The Calder Community Mosaic was designed to fit the entire wall of the Community Room, just inside the main entrance of the new Calder Branch Library by MBAC Architects. Illuminated by special lighting above the artwork and also open to the daylight through the floor-to-ceiling windows that wrap around almost the entire exterior of the LEED® Silver building, the mosaic is clearly visible from the street and library forecourt.
After a year and a half of preparation, the Calder Community Mosaic was given a final wipe, polish and an inspection and then it was finished!
In the first weeks of 2018 the Edmonton Public Library will take occupancy of their newest branch and complete their fit out of the space. Stay tuned for an official opening date in the New Year!
Our thanks to Craig Lemiski from Ellis Don for keeping us all safe on his construction site. His team has done a great job building the new library and it will be a public space that the whole community will be proud of. We also would like to thank the support and assistance from Robert Harpin, Andrea Bowes and Eva Marie Clarke from the Edmonton Arts Council.
This project is supported by the Edmonton Arts Council on behalf of the Edmonton Public Library and the City of Edmonton.
Calder Community Mosaic: Installation – part 4. Grouting the Tiles
At the end of a busy week the last major step was to apply the grout that fills in the gaps between each tile. We chose a middle grey colour that would continue to look good over time and would unite the complete mosaic design together while also giving each unique art-glass triangle tile definition. Thanks again to Csaba and Adam from the Tile Setting Company for their great work!
This project is supported by the Edmonton Arts Council on behalf of the Edmonton Public Library and the City of Edmonton.
Calder Community Mosaic: Installation – part 3. Setting the Tiles
Watching the mosaic come together in its final form up onto the Community Room wall was an exciting process. Each part of the overall pattern that forms the final mosaic design was sourced directly from members of the Calder Community who attended one of the community pattern workshops held in June 2016.
In the spirit of the project, the installation team worked together and over one full day we unboxed and prepared each numbered panel before Csaba Bereczki, Journeyman Installer and owner of The Tilesetter Company and his assistant Adam set the patterns in place up on the wall. There is positive energy and everything is looking good!
This project is supported by the Edmonton Arts Council on behalf of the Edmonton Public Library and the City of Edmonton.
Calder Community Mosaic: Installation – part 2. Preparing the Wall
For the final part of the project, the installation of the custom art-glass tile mosaic onto the wall of the Calder Branch Library’s Community Room, we turned to the expertise of Edmonton-local Csaba Bereczki, Journeyman Installer and owner of The Tilesetter Company. With his assistant, Adam, they prepared the 4.8m x 2.4m wall in the Community Room with a special anti-fracture membrane. The new 10,000 sq. ft. stand-alone Calder Branch Library is LEED® Silver certified and all the products used in the installation of the new artwork are the best available and will ensure that the Mosaic looks its very best for many years to come.
This project is supported by the Edmonton Arts Council on behalf of the Edmonton Public Library and the City of Edmonton.
Calder Community Mosaic: Installation – part 1. Shipping and Handling
After weeks of careful assembly, the mosaic panels were packed up at our studio and made ready for transportation to the Calder Branch Library. Special thanks to Annie and Terri from Taste Culinary Solutions for lending us their warehouse and helping us with their forklift.
Andrea Bowes, Public Art Conservator with the Edmonton Arts Council gave us a warm welcome to Edmonton and assisted us with the delivery of the mosaic boxes to the nearly completed Calder Branch Library. After 18 months of design and fabrication it is a big relief to have the tiles safely inside the beautiful new library by MBAC!
This project is supported by the Edmonton Arts Council on behalf of the Edmonton Public Library and the City of Edmonton.